What We Did
Level 5 offices at Westfield Newmarket required a high-end office fit-out. After demolition and removal of existing skirting, we infilled a wall in place of a double door, replaced existing skirting, installed partition and glazed walls. We installed custom CNC routed wall panels. Removed existing carpet tiles & replace them with new ones. The new floor allowed for transition strips between the polish and carpeted floors creating a perfect and sophisticated finish.